Vulnerabilities (CVE)

Filtered by vendor Oracle Subscribe
Filtered by product Primavera P6 Enterprise Project Portfolio Management
CVE Vendors Products Updated CVSS v2 CVSS v3
CVE-2021-2351 1 Oracle 110 Advanced Networking Option, Agile Engineering Data Management, Agile Plm and 107 more 2023-08-08 5.1 MEDIUM 8.3 HIGH
Vulnerability in the Advanced Networking Option component of Oracle Database Server. Supported versions that are affected are 12.1.0.2, 12.2.0.1 and 19c. Difficult to exploit vulnerability allows unauthenticated attacker with network access via Oracle Net to compromise Advanced Networking Option. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Advanced Networking Option, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in takeover of Advanced Networking Option. Note: The July 2021 Critical Patch Update introduces a number of Native Network Encryption changes to deal with vulnerability CVE-2021-2351 and prevent the use of weaker ciphers. Customers should review: "Changes in Native Network Encryption with the July 2021 Critical Patch Update" (Doc ID 2791571.1). CVSS 3.1 Base Score 8.3 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:C/C:H/I:H/A:H).
CVE-2021-45105 5 Apache, Debian, Netapp and 2 more 44 Log4j, Debian Linux, Cloud Manager and 41 more 2022-07-25 4.3 MEDIUM 5.9 MEDIUM
Apache Log4j2 versions 2.0-alpha1 through 2.16.0 (excluding 2.12.3 and 2.3.1) did not protect from uncontrolled recursion from self-referential lookups. This allows an attacker with control over Thread Context Map data to cause a denial of service when a crafted string is interpreted. This issue was fixed in Log4j 2.17.0, 2.12.3, and 2.3.1.
CVE-2021-44832 5 Apache, Cisco, Debian and 2 more 13 Log4j, Cloudcenter, Debian Linux and 10 more 2022-07-25 8.5 HIGH 6.6 MEDIUM
Apache Log4j2 versions 2.0-beta7 through 2.17.0 (excluding security fix releases 2.3.2 and 2.12.4) are vulnerable to a remote code execution (RCE) attack when a configuration uses a JDBC Appender with a JNDI LDAP data source URI when an attacker has control of the target LDAP server. This issue is fixed by limiting JNDI data source names to the java protocol in Log4j2 versions 2.17.1, 2.12.4, and 2.3.2.
CVE-2020-10683 5 Canonical, Dom4j Project, Netapp and 2 more 38 Ubuntu Linux, Dom4j, Oncommand Api Services and 35 more 2022-07-25 7.5 HIGH 9.8 CRITICAL
dom4j before 2.0.3 and 2.1.x before 2.1.3 allows external DTDs and External Entities by default, which might enable XXE attacks. However, there is popular external documentation from OWASP showing how to enable the safe, non-default behavior in any application that uses dom4j.
CVE-2020-2707 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2022-07-08 4.9 MEDIUM 5.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: WebAccess). Supported versions that are affected are 15.1.0.0-15.2.18.7, 16.1.0.0-16.2.19.0, 17.1.0.0-17.12.16.0, 18.1.0.0-18.8.16.0 and 19.12.0.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-11039 3 Debian, Oracle, Vmware 33 Debian Linux, Agile Plm, Application Testing Suite and 30 more 2022-06-23 4.3 MEDIUM 5.9 MEDIUM
Spring Framework (versions 5.0.x prior to 5.0.7, versions 4.3.x prior to 4.3.18, and older unsupported versions) allow web applications to change the HTTP request method to any HTTP method (including TRACE) using the HiddenHttpMethodFilter in Spring MVC. If an application has a pre-existing XSS vulnerability, a malicious user (or attacker) can use this filter to escalate to an XST (Cross Site Tracing) attack.
CVE-2020-5421 3 Netapp, Oracle, Vmware 38 Oncommand Insight, Snap Creator Framework, Snapcenter and 35 more 2022-06-23 3.6 LOW 6.5 MEDIUM
In Spring Framework versions 5.2.0 - 5.2.8, 5.1.0 - 5.1.17, 5.0.0 - 5.0.18, 4.3.0 - 4.3.28, and older unsupported versions, the protections against RFD attacks from CVE-2015-5211 may be bypassed depending on the browser used through the use of a jsessionid path parameter.
CVE-2019-10219 3 Netapp, Oracle, Redhat 194 Active Iq Unified Manager, Element, Management Services For Element Software And Netapp Hci and 191 more 2022-05-23 4.3 MEDIUM 6.1 MEDIUM
A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack.
CVE-2009-2625 7 Apache, Canonical, Debian and 4 more 9 Xerces2 Java, Ubuntu Linux, Debian Linux and 6 more 2022-05-13 5.0 MEDIUM N/A
XMLScanner.java in Apache Xerces2 Java, as used in Sun Java Runtime Environment (JRE) in JDK and JRE 6 before Update 15 and JDK and JRE 5.0 before Update 20, and in other products, allows remote attackers to cause a denial of service (infinite loop and application hang) via malformed XML input, as demonstrated by the Codenomicon XML fuzzing framework.
CVE-2018-1000632 5 Debian, Dom4j Project, Netapp and 2 more 15 Debian Linux, Dom4j, Oncommand Workflow Automation and 12 more 2021-09-07 5.0 MEDIUM 7.5 HIGH
dom4j version prior to version 2.1.1 contains a CWE-91: XML Injection vulnerability in Class: Element. Methods: addElement, addAttribute that can result in an attacker tampering with XML documents through XML injection. This attack appear to be exploitable via an attacker specifying attributes or elements in the XML document. This vulnerability appears to have been fixed in 2.1.1 or later.
CVE-2021-2366 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2021-07-26 5.5 MEDIUM 6.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.12.0-17.12.20, 18.8.0-18.8.23, 19.12.0-19.12.14 and 20.12.0-20.12.3. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. While the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 6.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:C/C:L/I:L/A:N).
CVE-2021-2386 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2021-07-26 4.0 MEDIUM 4.3 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.0-20.12.3. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N).
CVE-2018-14718 5 Debian, Fasterxml, Netapp and 2 more 26 Debian Linux, Jackson-databind, Oncommand Workflow Automation and 23 more 2021-05-21 7.5 HIGH 9.8 CRITICAL
FasterXML jackson-databind 2.x before 2.9.7 might allow remote attackers to execute arbitrary code by leveraging failure to block the slf4j-ext class from polymorphic deserialization.
CVE-2018-14719 5 Debian, Fasterxml, Netapp and 2 more 21 Debian Linux, Jackson-databind, Oncommand Workflow Automation and 18 more 2021-05-21 7.5 HIGH 9.8 CRITICAL
FasterXML jackson-databind 2.x before 2.9.7 might allow remote attackers to execute arbitrary code by leveraging failure to block the blaze-ds-opt and blaze-ds-core classes from polymorphic deserialization.
CVE-2018-5407 7 Canonical, Debian, Nodejs and 4 more 20 Ubuntu Linux, Debian Linux, Node.js and 17 more 2020-09-18 1.9 LOW 4.7 MEDIUM
Simultaneous Multi-threading (SMT) in processors can enable local users to exploit software vulnerable to timing attacks via a side-channel timing attack on 'port contention'.
CVE-2018-19360 4 Debian, Fasterxml, Oracle and 1 more 12 Debian Linux, Jackson-databind, Business Process Management Suite and 9 more 2020-08-31 7.5 HIGH 9.8 CRITICAL
FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the axis2-transport-jms class from polymorphic deserialization.
CVE-2018-19361 4 Debian, Fasterxml, Oracle and 1 more 12 Debian Linux, Jackson-databind, Business Process Management Suite and 9 more 2020-08-31 7.5 HIGH 9.8 CRITICAL
FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the openjpa class from polymorphic deserialization.
CVE-2018-19362 4 Debian, Fasterxml, Oracle and 1 more 12 Debian Linux, Jackson-databind, Business Process Management Suite and 9 more 2020-08-31 7.5 HIGH 9.8 CRITICAL
FasterXML jackson-databind 2.x before 2.9.8 might allow attackers to have unspecified impact by leveraging failure to block the jboss-common-core class from polymorphic deserialization.
CVE-2019-2701 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-08-24 4.0 MEDIUM 4.3 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). The supported version that is affected is 18.8. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N).
CVE-2018-0735 6 Canonical, Debian, Netapp and 3 more 23 Ubuntu Linux, Debian Linux, Cloud Backup and 20 more 2020-08-24 4.3 MEDIUM 5.9 MEDIUM
The OpenSSL ECDSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). Fixed in OpenSSL 1.1.1a (Affected 1.1.1).
CVE-2019-2512 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-08-24 4.0 MEDIUM 4.7 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.1, 15.2, 16.1, 16.2, 17.7-17.12 and 18.8. Difficult to exploit vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.7 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:H/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2020-14706 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-07-20 4.0 MEDIUM 5.9 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.1.0.0-17.12.17.1, 18.1.0.0-18.8.19 and 19.12.0-19.12.5. Difficult to exploit vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 5.9 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:U/C:H/I:L/A:N).
CVE-2020-14653 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-07-20 5.5 MEDIUM 5.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 16.1.0.0-16.2.20.1, 17.1.0.0-17.12.17.1 and 18.1.0.0-18.8.18.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:L/A:N).
CVE-2020-2594 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-04-16 6.0 MEDIUM 6.5 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Project Manager). Supported versions that are affected are 16.2.0.0 - 16.2.19.3, 17.12.0.0 - 17.12.17.0, 18.8.0.0 - 18.8.18.0, 19.12.1.0 - 19.12.3.0 and 20.1.0.0 - 20.2.0.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data and unauthorized ability to cause a partial denial of service (partial DOS) of Primavera P6 Enterprise Project Portfolio Management. CVSS 3.0 Base Score 6.5 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:L).
CVE-2020-2706 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-04-15 5.8 MEDIUM 5.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Project Manager). Supported versions that are affected are 16.2.0.0 - 16.2.19.3, 17.12.0.0 - 17.12.17.0, 18.8.0.0 - 18.8.18.0, 19.12.1.0 - 19.12.3.0 and 20.1.0.0 - 20.2.0.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2020-2556 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-02-07 4.4 MEDIUM 7.3 HIGH
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Core). Supported versions that are affected are 16.2.0.0-16.2.19.0, 17.12.0.0-17.12.16.0, 18.8.0.0-18.8.16.0, 19.12.0.0 and 20.1.0.0. Easily exploitable vulnerability allows low privileged attacker with logon to the infrastructure where Primavera P6 Enterprise Project Portfolio Management executes to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data and unauthorized ability to cause a partial denial of service (partial DOS) of Primavera P6 Enterprise Project Portfolio Management. CVSS 3.0 Base Score 7.3 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.0/AV:L/AC:L/PR:L/UI:R/S:C/C:L/I:H/A:L).
CVE-2019-3020 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-21 5.8 MEDIUM 9.3 CRITICAL
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 15.1.0-15.2.18, 16.1.0-16.2.18, 17.1.0-17.12.14 and 18.1.0-18.8.11. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 9.3 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:H/I:H/A:N).
CVE-2019-2976 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-21 3.5 LOW 6.8 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.1.0-17.12.12. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.8 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:H/I:N/A:N).
CVE-2018-2963 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 4.0 MEDIUM 4.3 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x and 16.x. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N).
CVE-2018-3241 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 6.1 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.1, 15.2, 16.1, 16.2, 17.7 - 17.12 and 18.8. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-3281 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 6.1 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.1, 15.2, 16.1, 16.2, 17.7 - 17.12 and 18.8. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2017-3263 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.5 MEDIUM 8.1 HIGH
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Team Member). Supported versions that are affected are 8.2, 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS v3.0 Base Score 8.1 (Confidentiality and Integrity impacts).
CVE-2017-3579 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 6.1 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily "exploitable" vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2017-3503 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 6.5 MEDIUM 9.9 CRITICAL
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access (Apache Commons BeanUtils)). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily "exploitable" vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. While the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in takeover of Primavera P6 Enterprise Project Portfolio Management. CVSS 3.0 Base Score 9.9 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:C/C:H/I:H/A:H).
CVE-2017-3324 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 7.5 HIGH 10.0 CRITICAL
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.2, 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. While the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data and unauthorized ability to cause a partial denial of service (partial DOS) of Primavera P6 Enterprise Project Portfolio Management. CVSS v3.0 Base Score 10.0 (Confidentiality, Integrity and Availability impacts).
CVE-2018-2849 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 4.0 MEDIUM 7.7 HIGH
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 16.2 and 17.1 - 17.12. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. While the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 7.7 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:C/C:H/I:N/A:N).
CVE-2018-2960 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 6.1 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x, 16.x and 17.x. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-2961 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 6.1 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x, 16.x and 17.x. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-2962 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 3.6 LOW 4.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x, 16.x and 17.x. Difficult to exploit vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:H/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2017-10160 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 4.0 MEDIUM 4.3 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N).
CVE-2017-10131 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 6.0 MEDIUM 6.5 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data and unauthorized ability to cause a partial denial of service (partial DOS) of Primavera P6 Enterprise Project Portfolio Management. CVSS 3.0 Base Score 6.5 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:L).
CVE-2017-10046 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 4.9 MEDIUM 5.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2 and 16.1. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2017-10038 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 4.0 MEDIUM 6.5 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.5 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:U/C:H/I:N/A:N).
CVE-2017-3583 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 8.1 HIGH
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily "exploitable" vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 8.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:U/C:H/I:H/A:N).
CVE-2016-0635 1 Oracle 11 Documaker, Enterprise Manager Ops Center, Health Sciences Information Manager and 8 more 2019-04-23 9.0 HIGH 8.8 HIGH
Unspecified vulnerability in the Enterprise Manager Ops Center component in Oracle Enterprise Manager Grid Control 12.1.4, 12.2.2, and 12.3.2; the Oracle Health Sciences Information Manager component in Oracle Health Sciences Applications 1.2.8.3, 2.0.2.3, and 3.0.1.0; the Oracle Healthcare Master Person Index component in Oracle Health Sciences Applications 2.0.12, 3.0.0, and 4.0.1; the Oracle Documaker component in Oracle Insurance Applications before 12.5; the Oracle Insurance Calculation Engine component in Oracle Insurance Applications 9.7.1, 10.1.2, and 10.2.2; the Oracle Insurance Policy Administration J2EE and Oracle Insurance Rules Palette components in Oracle Insurance Applications 9.6.1, 9.7.1, 10.0.1, 10.1.2, 10.2.0, and 10.2.2; the Oracle Retail Integration Bus component in Oracle Retail Applications 15.0; the Oracle Retail Order Broker component in Oracle Retail Applications 5.1, 5.2, and 15.0; the Primavera Contract Management component in Oracle Primavera Products Suite 14.2; the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.2, 8.3, 8.4, 15.1, 15.2, and 16.1; the Oracle Financial Services Analytical Applications Infrastructure component in Oracle Financial Services Applications 8.0.0, 8.0.1, 8.0.2, and 8.0.3; the Oracle Commerce Guided Search / Oracle Commerce Experience Manager component in Oracle Commerce 3.1.1, 3.1.2, 11.0, 11.1, and 11.2; the Oracle Agile PLM component in Oracle Supply Chain Products Suite 9.3.4 and 9.3.5; the Oracle Communications BRM - Elastic Charging Engine 11.2.0.0.0 and 11.3.0.0.0; the Oracle Enterprise Repository Enterprise Repository 12.1.3.0.0; the Oracle Financial Services Behavior Detection Platform 8.0.1 and 8.0.2; the Oracle Hyperion Essbase 12.2.1.1; the Oracle Tuxedo System and Applications Monitor (TSAM) 11.1.1.2.0, 11.1.1.2.1, 11.1.1.2.1, 12.1.1.1.0, 12.1.3.0.0, and 12.2.2.0.0; the Oracle Communications WebRTC Session Controller component of Oracle Communications Applications (subcomponent: Security (Spring)) 7.0, 7.1 and 7.2; the Oracle Endeca Information Discovery Integrator 3.2; the Converged Commerce component of Oracle Retail Applications 16.0.1; the Oracle Identity Manager 11.1.2.3.0; Oracle Enterprise Manager for MySQL Database 12.1.0.4; Oracle Retail Invoice Matching 12.0, 13.0, 13.1, 13.2, 14.0, and 14.1; Oracle Communications Performance Intelligence Center (PIC) Software Prior to 10.2.1 and the Oracle Knowledge component of Oracle Siebel CRM (subcomponent: AnswerFlow (Spring Framework)) version 8.5.1.0 - 8.5.1.7 and 8.6.0 allows remote authenticated users to affect confidentiality, integrity, and availability via unknown vectors.
CVE-2016-3573 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.8 MEDIUM 6.1 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote attackers to affect confidentiality and integrity via vectors related to Web access, a different vulnerability than CVE-2016-3566, CVE-2016-3568, CVE-2016-3569, CVE-2016-3570, and CVE-2016-3571.
CVE-2016-3572 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.5 MEDIUM 6.4 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote authenticated users to affect confidentiality and integrity via vectors related to Web Access.
CVE-2016-3571 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.8 MEDIUM 6.1 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote attackers to affect confidentiality and integrity via vectors related to Web access, a different vulnerability than CVE-2016-3566, CVE-2016-3568, CVE-2016-3569, CVE-2016-3570, and CVE-2016-3573.
CVE-2016-3570 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.8 MEDIUM 6.1 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote attackers to affect confidentiality and integrity via vectors related to Web access, a different vulnerability than CVE-2016-3566, CVE-2016-3568, CVE-2016-3569, CVE-2016-3571, and CVE-2016-3573.
CVE-2016-3567 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 4.9 MEDIUM 5.4 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote authenticated users to affect confidentiality and integrity via vectors related to Web access.