Vulnerabilities (CVE)

Filtered by vendor Oracle Subscribe
Filtered by product Primavera P6 Enterprise Project Portfolio Management
CVE Vendors Products Updated CVSS v2 CVSS v3
CVE-2021-44832 5 Apache, Cisco, Debian and 2 more 13 Log4j, Cloudcenter, Debian Linux and 10 more 2022-07-25 8.5 HIGH 6.6 MEDIUM
Apache Log4j2 versions 2.0-beta7 through 2.17.0 (excluding security fix releases 2.3.2 and 2.12.4) are vulnerable to a remote code execution (RCE) attack when a configuration uses a JDBC Appender with a JNDI LDAP data source URI when an attacker has control of the target LDAP server. This issue is fixed by limiting JNDI data source names to the java protocol in Log4j2 versions 2.17.1, 2.12.4, and 2.3.2.
CVE-2021-45105 5 Apache, Debian, Netapp and 2 more 44 Log4j, Debian Linux, Cloud Manager and 41 more 2022-07-25 4.3 MEDIUM 5.9 MEDIUM
Apache Log4j2 versions 2.0-alpha1 through 2.16.0 (excluding 2.12.3 and 2.3.1) did not protect from uncontrolled recursion from self-referential lookups. This allows an attacker with control over Thread Context Map data to cause a denial of service when a crafted string is interpreted. This issue was fixed in Log4j 2.17.0, 2.12.3, and 2.3.1.
CVE-2020-2707 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2022-07-08 4.9 MEDIUM 5.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: WebAccess). Supported versions that are affected are 15.1.0.0-15.2.18.7, 16.1.0.0-16.2.19.0, 17.1.0.0-17.12.16.0, 18.1.0.0-18.8.16.0 and 19.12.0.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-11039 3 Debian, Oracle, Vmware 33 Debian Linux, Agile Plm, Application Testing Suite and 30 more 2022-06-23 4.3 MEDIUM 5.9 MEDIUM
Spring Framework (versions 5.0.x prior to 5.0.7, versions 4.3.x prior to 4.3.18, and older unsupported versions) allow web applications to change the HTTP request method to any HTTP method (including TRACE) using the HiddenHttpMethodFilter in Spring MVC. If an application has a pre-existing XSS vulnerability, a malicious user (or attacker) can use this filter to escalate to an XST (Cross Site Tracing) attack.
CVE-2020-5421 3 Netapp, Oracle, Vmware 38 Oncommand Insight, Snap Creator Framework, Snapcenter and 35 more 2022-06-23 3.6 LOW 6.5 MEDIUM
In Spring Framework versions 5.2.0 - 5.2.8, 5.1.0 - 5.1.17, 5.0.0 - 5.0.18, 4.3.0 - 4.3.28, and older unsupported versions, the protections against RFD attacks from CVE-2015-5211 may be bypassed depending on the browser used through the use of a jsessionid path parameter.
CVE-2019-10219 3 Netapp, Oracle, Redhat 194 Active Iq Unified Manager, Element, Management Services For Element Software And Netapp Hci and 191 more 2022-05-23 4.3 MEDIUM 6.1 MEDIUM
A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack.
CVE-2021-2366 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2021-07-26 5.5 MEDIUM 6.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.12.0-17.12.20, 18.8.0-18.8.23, 19.12.0-19.12.14 and 20.12.0-20.12.3. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. While the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 6.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:C/C:L/I:L/A:N).
CVE-2021-2386 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2021-07-26 4.0 MEDIUM 4.3 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.0-20.12.3. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N).
CVE-2018-5407 7 Canonical, Debian, Nodejs and 4 more 20 Ubuntu Linux, Debian Linux, Node.js and 17 more 2020-09-18 1.9 LOW 4.7 MEDIUM
Simultaneous Multi-threading (SMT) in processors can enable local users to exploit software vulnerable to timing attacks via a side-channel timing attack on 'port contention'.
CVE-2019-2512 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-08-24 4.0 MEDIUM 4.7 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.1, 15.2, 16.1, 16.2, 17.7-17.12 and 18.8. Difficult to exploit vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.7 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:H/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-0735 6 Canonical, Debian, Netapp and 3 more 23 Ubuntu Linux, Debian Linux, Cloud Backup and 20 more 2020-08-24 4.3 MEDIUM 5.9 MEDIUM
The OpenSSL ECDSA signature algorithm has been shown to be vulnerable to a timing side channel attack. An attacker could use variations in the signing algorithm to recover the private key. Fixed in OpenSSL 1.1.0j (Affected 1.1.0-1.1.0i). Fixed in OpenSSL 1.1.1a (Affected 1.1.1).
CVE-2019-2701 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-08-24 4.0 MEDIUM 4.3 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). The supported version that is affected is 18.8. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N).
CVE-2020-14706 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-07-20 4.0 MEDIUM 5.9 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.1.0.0-17.12.17.1, 18.1.0.0-18.8.19 and 19.12.0-19.12.5. Difficult to exploit vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 5.9 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:U/C:H/I:L/A:N).
CVE-2020-14653 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-07-20 5.5 MEDIUM 5.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 16.1.0.0-16.2.20.1, 17.1.0.0-17.12.17.1 and 18.1.0.0-18.8.18.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:L/A:N).
CVE-2020-2594 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-04-16 6.0 MEDIUM 6.5 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Project Manager). Supported versions that are affected are 16.2.0.0 - 16.2.19.3, 17.12.0.0 - 17.12.17.0, 18.8.0.0 - 18.8.18.0, 19.12.1.0 - 19.12.3.0 and 20.1.0.0 - 20.2.0.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data and unauthorized ability to cause a partial denial of service (partial DOS) of Primavera P6 Enterprise Project Portfolio Management. CVSS 3.0 Base Score 6.5 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:L).
CVE-2020-2706 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2020-04-15 5.8 MEDIUM 5.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Project Manager). Supported versions that are affected are 16.2.0.0 - 16.2.19.3, 17.12.0.0 - 17.12.17.0, 18.8.0.0 - 18.8.18.0, 19.12.1.0 - 19.12.3.0 and 20.1.0.0 - 20.2.0.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2019-2976 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-21 3.5 LOW 6.8 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.1.0-17.12.12. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.8 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:H/I:N/A:N).
CVE-2018-2963 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 4.0 MEDIUM 4.3 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x and 16.x. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N).
CVE-2017-10038 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 4.0 MEDIUM 6.5 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.5 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:U/C:H/I:N/A:N).
CVE-2017-10046 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 4.9 MEDIUM 5.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2 and 16.1. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2017-10131 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 6.0 MEDIUM 6.5 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data and unauthorized ability to cause a partial denial of service (partial DOS) of Primavera P6 Enterprise Project Portfolio Management. CVSS 3.0 Base Score 6.5 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:L).
CVE-2017-10160 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 4.0 MEDIUM 4.3 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N).
CVE-2017-3579 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 6.1 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Primavera Products Suite (subcomponent: Web Access). Supported versions that are affected are 8.3, 8.4, 15.1, 15.2, 16.1 and 16.2. Easily "exploitable" vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-2960 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 6.1 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x, 16.x and 17.x. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-2961 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 6.1 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x, 16.x and 17.x. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-2962 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 3.6 LOW 4.4 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.x, 16.x and 17.x. Difficult to exploit vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:H/PR:L/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-3241 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 6.1 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.1, 15.2, 16.1, 16.2, 17.7 - 17.12 and 18.8. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2018-3281 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2019-10-03 5.8 MEDIUM 6.1 MEDIUM
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). Supported versions that are affected are 8.4, 15.1, 15.2, 16.1, 16.2, 17.7 - 17.12 and 18.8. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.1 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:L/I:L/A:N).
CVE-2016-3567 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 4.9 MEDIUM 5.4 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote authenticated users to affect confidentiality and integrity via vectors related to Web access.
CVE-2016-3566 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.8 MEDIUM 6.1 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote attackers to affect confidentiality and integrity via vectors related to Web access, a different vulnerability than CVE-2016-3568, CVE-2016-3569, CVE-2016-3570, CVE-2016-3571, and CVE-2016-3573.
CVE-2016-3573 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.8 MEDIUM 6.1 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote attackers to affect confidentiality and integrity via vectors related to Web access, a different vulnerability than CVE-2016-3566, CVE-2016-3568, CVE-2016-3569, CVE-2016-3570, and CVE-2016-3571.
CVE-2016-3572 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.5 MEDIUM 6.4 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote authenticated users to affect confidentiality and integrity via vectors related to Web Access.
CVE-2016-3571 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.8 MEDIUM 6.1 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote attackers to affect confidentiality and integrity via vectors related to Web access, a different vulnerability than CVE-2016-3566, CVE-2016-3568, CVE-2016-3569, CVE-2016-3570, and CVE-2016-3573.
CVE-2016-3570 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.8 MEDIUM 6.1 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote attackers to affect confidentiality and integrity via vectors related to Web access, a different vulnerability than CVE-2016-3566, CVE-2016-3568, CVE-2016-3569, CVE-2016-3571, and CVE-2016-3573.
CVE-2016-3569 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.8 MEDIUM 6.1 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote attackers to affect confidentiality and integrity via vectors related to Web access, a different vulnerability than CVE-2016-3566, CVE-2016-3568, CVE-2016-3570, CVE-2016-3571, and CVE-2016-3573.
CVE-2016-3568 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2017-09-01 5.8 MEDIUM 6.1 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.3, 8.4, 15.1, 15.2, and 16.1 allows remote attackers to affect confidentiality and integrity via vectors related to Web access, a different vulnerability than CVE-2016-3566, CVE-2016-3569, CVE-2016-3570, CVE-2016-3571, and CVE-2016-3573.
CVE-2016-5533 1 Oracle 1 Primavera P6 Enterprise Project Portfolio Management 2016-11-28 5.5 MEDIUM 5.4 MEDIUM
Unspecified vulnerability in the Primavera P6 Enterprise Project Portfolio Management component in Oracle Primavera Products Suite 8.4, 15.x, and 16.x allows remote authenticated users to affect confidentiality and integrity via unknown vectors.